CAN RECORD SECONDARY SCHOOL

ARCHITECTS

BCQ arquitectura barcelona

LOCATION

Sant Esteve de Palautordera, Barcelona

YEAR

2019

CLIENT

Infraestructures.cat | Department of Education

AREA

Building 2.770 m² | Public space 5.997 m²

STATUS

Built

COLLABORATOR

BAC Engineering (structures), AIA Instal·lacions Arquitectòniques (MEP engineering), FAHE Consulting Arquitectura (QS), Valeri Consultors (construction management)

CONTRACTOR

CONSTRUCCIONES COTS I CLARET,SL

BUDGET

3.066.142 €

The clear and simple volume is arranged almost parallel to the footpath. One of the most important decisions is the fact that the building is located on level of the access, and adapts to the natural topography of the land by placing pieces of the program (gymnasium) or lower porch space to avoid earth movements to the maximum possible.
The set is organized in two parts in “L” shape located at the extreme North-West.
The main piece, longitudinal to the plot and parallel to the street, contains all the teaching program, allowing its future continued growth towards the east without affecting the daily life of the center. The second piece, of shorter length, is perpendicular to the main piece, and brings together the sports requirements of the center.

FIRST PRIZE IN RESTRICTED DESIGN COMPETITION

RELATED PROJECTS

ARCHITECTS

BCQ arquitectura barcelona

LOCATION

Sant Esteve de Palautordera, Barcelona

YEAR

2019

CLIENT

Infraestructures.cat | Department of Education

AREA

Building 2.770 m² | Public space 5.997 m²

STATUS

Built

COLLABORATOR

BAC Engineering (structures), AIA Instal·lacions Arquitectòniques (MEP engineering), FAHE Consulting Arquitectura (QS), Valeri Consultors (construction management)

CONTRACTOR

CONSTRUCCIONES COTS I CLARET,SL

BUDGET

3.066.142 €

The clear and simple volume is arranged almost parallel to the footpath. One of the most important decisions is the fact that the building is located on level of the access, and adapts to the natural topography of the land by placing pieces of the program (gymnasium) or lower porch space to avoid earth movements to the maximum possible.
The set is organized in two parts in “L” shape located at the extreme North-West.
The main piece, longitudinal to the plot and parallel to the street, contains all the teaching program, allowing its future continued growth towards the east without affecting the daily life of the center. The second piece, of shorter length, is perpendicular to the main piece, and brings together the sports requirements of the center.

FIRST PRIZE IN RESTRICTED DESIGN COMPETITION

RELATED PROJECTS

CAN RECORD SECONDARY SCHOOL
CULTURAL/EDUCATIONAL
CAN RECORD SECONDARY SCHOOL
CULTURAL/EDUCATIONAL
CAN RECORD SECONDARY SCHOOL
CULTURAL/EDUCATIONAL
Previous slide
Next slide
[slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-01.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Exterior view

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-02.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Interior view

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-03.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Interior view

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-7.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Building scheme

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-1.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Ground floor

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-2.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

First floor

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-3.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

West elevation

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-4.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

South elevation

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-5.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Longitudinal section

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-6.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Cross section

Sports hall and Municiapl works center [/slide]