ALT MARESME WASTEWATER TREATMENT PLANT

ARCHITECTS

BCQ arquitectura barcelona

LOCATION

Tordera, Pineda de Mar, Barcelona

YEAR

2012

CLIENT

Catalan Water Agency

AREA

Building 10.960 m² | Public space 26.627 m²

STATUS

Built (1st phase)

COLLABORATOR

Jordi Granada (structures), E3G Enginyeria i Energia (MEP engineering), Equip Tècnic Topogràfic (topography), Roser Vives (landscape architect), Andrea Sanglas (model), Saida Dalmau, Virtujuga (Visuals), Pedro Pegenaute (photography)

CONTRACTOR

COPISA

BUDGET

12.778.625€

A wastewater treatment plant (WWTP) is a big territorial “filter” which roughly purifies water after urban use before returning it to the sea. So we imagined that this image of “filter” could be the image of the treatment plant. A filter between spaces, a light filter, a filter between the landscape and an industrial image installation.
The Alt Maresme WWTP project includes sewage sanitation system consisting of 3 different facilities and strategically located in the territory, the Pump Station (PS) at the mouth of the stream of Pineda, the Pretreatment (PT) in front the beach near a small cemetery, and the treatment of sludge and waters line, located in the former Montpalau’s quarry (WWTP).


WINNER MIPIM AWARDS 2013 BEST INDUSTRIAL & LOGISTICS DEVELOPMENT
NOMINATION 2014 GERMAN DESIGN AWARDS

RELATED PROJECTS

ARCHITECTS

BCQ arquitectura barcelona

LOCATION

Tordera, Pineda de Mar, Barcelona

YEAR

2012

CLIENT

Catalan Water Agency

AREA

Building 10.960 m² | Public space 26.627 m²

STATUS

Built (1st phase)

COLLABORATOR

Jordi Granada (structures), E3G Enginyeria i Energia (MEP engineering), Equip Tècnic Topogràfic (topography), Roser Vives (landscape architect), Andrea Sanglas (model), Saida Dalmau, Virtujuga (Visuals), Pedro Pegenaute (photography)

CONTRACTOR

COPISA

BUDGET

12.778.625€

A wastewater treatment plant (WWTP) is a big territorial “filter” which roughly purifies water after urban use before returning it to the sea. So we imagined that this image of “filter” could be the image of the treatment plant. A filter between spaces, a light filter, a filter between the landscape and an industrial image installation.
The Alt Maresme WWTP project includes sewage sanitation system consisting of 3 different facilities and strategically located in the territory, the Pump Station (PS) at the mouth of the stream of Pineda, the Pretreatment (PT) in front the beach near a small cemetery, and the treatment of sludge and waters line, located in the former Montpalau’s quarry (WWTP).


WINNER MIPIM AWARDS 2013 BEST INDUSTRIAL & LOGISTICS DEVELOPMENT
NOMINATION 2014 GERMAN DESIGN AWARDS

RELATED PROJECTS

ALT MARESME WASTEWATER TREATMENT PLANT
FACILITIES
ALT MARESME WASTEWATER TREATMENT PLANT
FACILITIES
ALT MARESME WASTEWATER TREATMENT PLANT
FACILITIES
ALT MARESME WASTEWATER TREATMENT PLANT
FACILITIES
ALT MARESME WASTEWATER TREATMENT PLANT
FACILITIES
Previous slide
Next slide
[slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-01.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Exterior view

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-02.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Interior view

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-03.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Interior view

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-7.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Building scheme

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-1.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Ground floor

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-2.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

First floor

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-3.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

West elevation

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-4.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

South elevation

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-5.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Longitudinal section

Sports hall and Municiapl works center [/slide] [slide type=”image” image=”http://bcq.es/wp-content/uploads/2020/10/PAV3-6.jpg” image_alt=”” css_class=”fullscreen fit-scale-up-allowed”]

Cross section

Sports hall and Municiapl works center [/slide]